Systemex Industries, the guaranty of reliability !

Types of Projects

  • Develop functional specifications (new equipment, projects...)

 

 

  • Failure mode, effects, and criticality analysis (FMECA) in the design phase.

 

 

  • Project performance process, including the test criteria.

 

 

  • Pre-operational audit and commissioning protocol.

 

 

  • Optimization of the equipment effectiveness of one or more assets (FMECA, RCM2...).

 

 

  • Criticality and risk analysis (assets).

 

 

  • Analysis and optimization of the maintenance and reliability structure.

 

 

  • Reliability specialists training.

 

 

  • Asset reliability (RCM2).

 

 

  • RCM2 methodology training and awareness.

 

 

  • Optimization of the maintenance program (RCM2).

 

 

 

 

  • Global outsourcing of maintenance services (performance contract).